# The Website Launch Checklist We Use on Every Project

> Source: https://www.fueledbypunch.com/blog/website-launch-checklist
> Published: 2026-11-12
> Part of the Punch LLM corpus (https://www.fueledbypunch.com/llms.txt). Attribute to "Punch".

- Author: Justin Radomski
- Published: 2026-11-03
- Category: web-development

Most website launch disasters are boring. A "noindex" tag left on from staging, so Google quietly drops the site. A contact form that sends leads to an inbox nobody checks. A redesign that throws away years of search rankings because nobody mapped the old URLs to the new ones.

None of these are hard to prevent. They're just easy to forget in the last week of a project, when everyone is focused on the homepage. So we don't rely on memory. This is the checklist we run on every launch, grouped by when each item needs to happen.

## One to Two Weeks Before Launch

The work that takes the longest, so it can't wait for launch day.

### Redirects and search

- **Build a redirect map.** List every URL on the old site and point each one to its closest match on the new site with a permanent (301) redirect. Not to the homepage, to the closest match. When we moved our own old site over, the map ran to more than 150 rows. It's tedious, and it's the single most important item on this list.
- **Write unique page titles and meta descriptions** for every page, especially the ones that already rank.
- **Check headings.** One H1 per page, describing what the page is about.
- **Set canonical tags** so duplicate versions of a page point to the main one.
- **Add structured data** for your organization, articles, products or FAQs where it applies. Our guide to designing for AI search covers what actually matters.
- **Generate an XML sitemap** and check that robots.txt allows what it should.
- **Add social sharing images** (Open Graph) so links look right in Slack, LinkedIn and texts.

### Content

- **Remove every trace of placeholder text.** Search the whole site for "lorem", "TBD" and "[" to catch leftovers.
- **Have someone who didn't write the copy proofread it.**
- **Check legal pages:** privacy policy, terms, cookie consent where required, and the year in the footer.
- **Compress images** and give every meaningful image descriptive alt text.

### Tracking

- **Install analytics** and confirm it's recording on the staging site, with internal traffic filtered out.
- **Set up conversion tracking** for the actions that matter: form submissions, calls, bookings, purchases.
- **Verify the site in Google Search Console** so you're ready to submit the sitemap on launch day.

## The Week Before: Test Everything

**Submit every form on the new site**

Then confirm where each submission actually went: the inbox, the CRM, the Slack channel. Test the spam protection too, and the confirmation message the visitor sees. Broken forms are the most expensive launch bug, because nobody notices until someone asks where the leads went.

**Test on real devices**

Safari on an iPhone, Chrome on an Android, and the browsers your analytics say your customers use. Simulators miss things real phones don't.

**Crawl for broken links**

Run a crawler like Screaming Frog over the staging site to catch 404s, redirect chains and missing images before your visitors do.

**Check accessibility**

Tab through key pages with a keyboard, check color contrast, and run an automated scan. Our website accessibility guide covers the six problems behind almost every failure.

**Check performance**

Test your main page templates with PageSpeed Insights on mobile. If something is slow, it's usually an oversized image, too many fonts or a heavy third-party script. Our performance breakdown explains where the time goes.

**Design the 404 page**

Someone will hit it. Make it helpful, with search or links to your main pages, instead of a dead end.

**Add the small details**

Favicon, app icons and a default social image.

## Launch Day

- **Pick your launch window.** Early in the week, early in the day, with the people who can fix things available. Never 4 p.m. on a Friday.
- **Back up the old site** completely, files and database, before you touch DNS.
- **Lower your DNS TTL** a day or two ahead so the switch takes effect quickly, and confirm who has the login for your domain registrar. This is where launches stall most often.
- **Check SSL** on every version of your domain, and make sure http, https, www and non-www all end up at one address.
- **Remove "noindex" and staging passwords.** Then check the live page source to confirm it's actually gone.
- **Test redirects on the live domain**, starting with your highest-traffic old URLs.
- **Submit the new sitemap** in Google Search Console.
- **Submit a real form** on the live site and confirm it arrives.
- **Check analytics** is recording live visits.

**Tip**

Assign one person to own the checklist on launch day. Not to do every task, but to check each item off and confirm it's actually done. Launches go wrong when everyone assumes someone else checked.

## The First Two Weeks After Launch

Launch isn't the finish line. The first two weeks are when problems that testing missed show up.

- **Watch Search Console** for crawl errors and 404s, and add redirects for any old URLs you missed.
- **Compare traffic and conversions** with the same period before launch. A dip in the first week or two is normal, but a sustained drop means something is wrong.
- **Monitor uptime** with an alert that reaches a real person.
- **Keep checking forms.** Set a reminder to submit a test entry every few days for the first month.
- **Collect the "small things" list.** Feedback will arrive. Fix the urgent items now, and save the nice-to-haves for a planned phase two instead of an endless trickle of changes.
- **Review Core Web Vitals field data** once real visitors have used the site for a few weeks, because Google's report needs time to collect data.

## Why Launch Phases Get Squeezed

In our breakdown of how long a website redesign takes, content, QA and launch is the phase most often squeezed, and the most expensive to squeeze. When a project runs late, the time comes out of testing, and that's how forms break and rankings disappear.

**Takeaway**

Budget real time for launch, at least a week of QA, and protect it when the schedule slips. A site that launches a week late with working forms and mapped redirects will outperform one that launched on time without them.

## Launching Soon?

Every project we build goes through this checklist before launch, and through the post-launch watch afterwards. If you're planning a redesign or a platform migration and want it to launch without losing leads or rankings, let's talk about your project.
